TY - JOUR
T1 - Three-Stage Stochastic Unit Commitment for Microgrids Toward Frequency Security via Renewable Energy Deloading
AU - Qi, Xiao
AU - Zhao, Tianyang
AU - Liu, Xuan
AU - Wang, Peng
N1 - Publisher Copyright:
© 2010-2012 IEEE.
PY - 2023/11/1
Y1 - 2023/11/1
N2 - Renewable energy is boosting the deployment of microgrids (MGs) with stochastic and low inertia nature. To improve the operational efficiency of MGs while guaranteeing frequency security, a three-stage stochastic unit commitment problem is proposed, where renewable energy can be deloaded. In the first stage, the diesel generators (DGs) are scheduled, responding to uncertainties of loads and photovoltaic generator output. In the second stage, the outputs of DGs are optimized to reduce the operational cost under uncertain disturbances. In the third stage, a novel PV deloading strategy is proposed to test the frequency security of MGs. The three-stage optimization problem is formulated as a multi-stage stochastic optimization problem with recourse. This problem is then solved using a novel nested Benders decomposition algorithm with both dual cuts and partial primal cuts. Simulations are performed on an AC MG under different PV penetration levels and disturbances. The results verify the effectiveness of the proposed model in balancing operational efficiency, renewable energy utilization, and frequency security.
AB - Renewable energy is boosting the deployment of microgrids (MGs) with stochastic and low inertia nature. To improve the operational efficiency of MGs while guaranteeing frequency security, a three-stage stochastic unit commitment problem is proposed, where renewable energy can be deloaded. In the first stage, the diesel generators (DGs) are scheduled, responding to uncertainties of loads and photovoltaic generator output. In the second stage, the outputs of DGs are optimized to reduce the operational cost under uncertain disturbances. In the third stage, a novel PV deloading strategy is proposed to test the frequency security of MGs. The three-stage optimization problem is formulated as a multi-stage stochastic optimization problem with recourse. This problem is then solved using a novel nested Benders decomposition algorithm with both dual cuts and partial primal cuts. Simulations are performed on an AC MG under different PV penetration levels and disturbances. The results verify the effectiveness of the proposed model in balancing operational efficiency, renewable energy utilization, and frequency security.
KW - Frequency security
KW - multi-stage stochastic optimization
KW - nested Benders decomposition
KW - unit commitment
UR - https://www.scopus.com/pages/publications/85153335335
U2 - 10.1109/TSG.2023.3263273
DO - 10.1109/TSG.2023.3263273
M3 - 文章
AN - SCOPUS:85153335335
SN - 1949-3053
VL - 14
SP - 4256
EP - 4267
JO - IEEE Transactions on Smart Grid
JF - IEEE Transactions on Smart Grid
IS - 6
ER -