Skip to main navigation Skip to search Skip to main content

Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty

  • Xi'an Jiaotong University

Research output: Contribution to journalArticlepeer-review

12 Scopus citations

Abstract

Maintaining a positive balance between cash outflow and inflow is very important for contractors to smoothly implement projects. Based on this fact, with the objective of minimising the maximal cash flow gap, this paper investigates a dedicated resource-constrained multiproject scheduling problem with stochastic activity duration where renewable resources are dedicated to individual projects in advance, and the schedule of each project is then arranged independently. First, we construct an optimisation model for the problem and propose properties for it. Second, for the NP-hardness of the problem, we design a tabu search algorithm consisting of two modules and develop the measures according to the proposed properties to improve the searching efficiency of the algorithm. Finally, we conduct a computational experiment on a randomly generated dataset to evaluate the performance of the developed algorithm and analyse the effects of key parameters on the objective function value. The conclusions are as follows. The developed tabu search algorithm with the improvement measures is the most promising algorithm for solving the studied problem, and the contribution of the improvement measures may vary as the project parameters change. The maximal cash flow gap increases along with the resource factor, required robustness of project schedule, and discount rate per period of cash flows, and decreases with the increase in the project deadline, resource strength, number of milestone activities, advance payment proportion, or progress payment proportion. The interactions among the resource strength, resource factor, and project deadline may also generate an effect on the maximal cash flow gap.

Original languageEnglish
Pages (from-to)34-52
Number of pages19
JournalEuropean Journal of Operational Research
Volume310
Issue number1
DOIs
StatePublished - 1 Oct 2023

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • Dedicated resource
  • Maximum cash flow gap
  • Optimisation model
  • Project scheduling
  • Tabu search

Fingerprint

Dive into the research topics of 'Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty'. Together they form a unique fingerprint.

Cite this