TY - GEN
T1 - Study on the influence of power reduction process on the leakage rate of steam generator
AU - Zhao, Zhang
AU - Junjie, Yan
AU - Wenbo, Wang
AU - Daotong, Chong
AU - Minhua, Su
AU - Zichun, Wang
AU - Rongfa, Shen
N1 - Publisher Copyright:
© 2022 American Society of Mechanical Engineers (ASME). All rights reserved.
PY - 2022
Y1 - 2022
N2 - The steam generator tubes in PWR unit are prone to mechanical damage and corrosion hazard, tube cracks and steam generator leakage often occurs on alloy 600 tubes. Due to the better corrosion resistance of alloy 690, the tube leakage has never occurred in CPR1000 unit. However, based on the systematic study of the alloy 690 behavior in the PWR operation condition, cracks will also occur at the end of burnup life (EOL); in addition, whether the limit leakage value for steam generator operation originating from EDF units under full power operation is valid for CPR1000 unit should be investigated. For the same critical crack size, in the process of unit power reduction, the change of the pressure difference between the primary and secondary sides of steam generator may cause the leakage rate to exceed the operating limit. An overall model for CPR1000 unit was developed, the changes were investigated of the pressure difference and leakage rate on the primary and secondary sides of the steam generator under different unit load reduction rates, the results showed that for the critical size crack at the bottom of the hot leg, during the load reduction transient process, the calculated leakage rate will exceed the limit value of 44 L/h in the Operating Technical Specifications (OTS) of CPR1000 unit. Finally the corresponding operation strategy was proposed.
AB - The steam generator tubes in PWR unit are prone to mechanical damage and corrosion hazard, tube cracks and steam generator leakage often occurs on alloy 600 tubes. Due to the better corrosion resistance of alloy 690, the tube leakage has never occurred in CPR1000 unit. However, based on the systematic study of the alloy 690 behavior in the PWR operation condition, cracks will also occur at the end of burnup life (EOL); in addition, whether the limit leakage value for steam generator operation originating from EDF units under full power operation is valid for CPR1000 unit should be investigated. For the same critical crack size, in the process of unit power reduction, the change of the pressure difference between the primary and secondary sides of steam generator may cause the leakage rate to exceed the operating limit. An overall model for CPR1000 unit was developed, the changes were investigated of the pressure difference and leakage rate on the primary and secondary sides of the steam generator under different unit load reduction rates, the results showed that for the critical size crack at the bottom of the hot leg, during the load reduction transient process, the calculated leakage rate will exceed the limit value of 44 L/h in the Operating Technical Specifications (OTS) of CPR1000 unit. Finally the corresponding operation strategy was proposed.
KW - Leakage rate
KW - Steam generator
KW - power reduction
UR - https://www.scopus.com/pages/publications/85143144222
U2 - 10.1115/ICONE29-93629
DO - 10.1115/ICONE29-93629
M3 - 会议稿件
AN - SCOPUS:85143144222
SN - 9784888982566
T3 - International Conference on Nuclear Engineering, Proceedings, ICONE
BT - Nuclear Plant Operation and Maintenance, Engineering and Modification, Operation Life Extension (OLE), and Life Cycle
PB - American Society of Mechanical Engineers (ASME)
T2 - 2022 29th International Conference on Nuclear Engineering, ICONE 2022
Y2 - 8 August 2022 through 12 August 2022
ER -