Skip to main navigation Skip to search Skip to main content

Study on integrated optimization of multi-mode project payment scheduling

  • Xi'an Jiaotong University

Research output: Contribution to journalArticlepeer-review

2 Scopus citations

Abstract

The assumptions of the study are identified and the notations are defined firstly. Then the optimization models of multi-mode project payment scheduling problems (MPPSP) are constructed from the contractor's and the client's viewpoints respectively. On the basis of the results achieved, the problem of allocating financing costs between the both sides of the contract is investigated. The MPPSP from the integrated viewpoint of the contractor and the client is clarified and its optimization model that is composed of two optimization models is established. Through solving this model, the satisfactory payment schedule, which can not only maximize the collective profits of the contractor and the client but also allocate project's financing costs between them, may be obtained. Ultimately, the outcomes of the paper are illustrated by a practical instance.

Original languageEnglish
Pages (from-to)76-83
Number of pages8
JournalXitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice
Volume26
Issue number1
StatePublished - Jan 2006

Keywords

  • Allocation of financing costs
  • Optimization model
  • Performing mode of activity
  • Project payment scheduling

Fingerprint

Dive into the research topics of 'Study on integrated optimization of multi-mode project payment scheduling'. Together they form a unique fingerprint.

Cite this