Study on deregulated power market under energy supply companies changing bid strategy

Research output: Contribution to journalArticlepeer-review

3 Scopus citations

Abstract

Problems in deregulated power market are complex system engineering problem because any bidder can make the market change but no one can control the market completely. This paper presents how MCP is determined by PX and how many MCQ is changed under energy supply companies changing bid strategy. This research work is based on analysis on mechanisms of deregulated power market. A spectrum of formulas for calculating MCP and its change under energy supply companies changing their strategy are educed in the paper. Number testing results based on the formulas show that the formulas can describe the changes under energy supply companies changing their strategy in deregulated power market. The research work is useful to find the optimized bid strategy in the future. This project is supported by National Outstanding Young Investigator (No. 6970025).

Original languageEnglish
Pages (from-to)10-15
Number of pages6
JournalDianli Xitong Zidonghua/Automation of Electric Power Systems
Volume24
Issue number7
StatePublished - 2000

Keywords

  • Bid
  • Market cleaning price (MCP)
  • Market cleaning quantity (MCQ)
  • Power exchange (PX)
  • Power market

Fingerprint

Dive into the research topics of 'Study on deregulated power market under energy supply companies changing bid strategy'. Together they form a unique fingerprint.

Cite this