Skip to main navigation Skip to search Skip to main content

Single item lot sizing models with backlogging and outsourcing and non-decreasing inventory capacity

  • Hefei University of Technology
  • PLA Electronic Engineering Institute

Research output: Contribution to journal › Article › peer-review

3 Scopus citations

Abstract

This paper addresses a dynamic single-item lot sizing problem with backlogging and outsourcing and non-decreasing inventory capacity. By the means of the concept of sub-plan, the problem can be solved by first computing all possible sub-plans and then searching the best combination or concatenation of sub-plans using dynamic programming. All the sub-plans are described by a group of general mathematic formulae. The computation of the sub-plan can be decomposed into two sub-problems by relaxing the constraint that production level at production period of a sub-plan must be more than zero. Based on the properties of an optimal solution, two polynomial algorithms are devised to solve sub-problems and reintegrate the relaxed constraint. Finally, a dynamic programming algorithm with complexity 0(T4) is developed to solve the global problem, where T is number of periods in planning horizon. The performance of the proposed algorithm is evaluated by numeric experiment.

Original languageEnglish
Pages (from-to)87-96
Number of pages10
JournalXitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice
Volume27
Issue number9
StatePublished - Sep 2007
Externally publishedYes

Keywords

  • Backlogging
  • Dynamic programming
  • Inventory capacity
  • Lot sizing
  • Outsourcing

Fingerprint

Dive into the research topics of 'Single item lot sizing models with backlogging and outsourcing and non-decreasing inventory capacity'. Together they form a unique fingerprint.

Cite this