Abstract
This paper addresses a dynamic single-item lot sizing problem with backlogging and outsourcing and non-decreasing inventory capacity. By the means of the concept of sub-plan, the problem can be solved by first computing all possible sub-plans and then searching the best combination or concatenation of sub-plans using dynamic programming. All the sub-plans are described by a group of general mathematic formulae. The computation of the sub-plan can be decomposed into two sub-problems by relaxing the constraint that production level at production period of a sub-plan must be more than zero. Based on the properties of an optimal solution, two polynomial algorithms are devised to solve sub-problems and reintegrate the relaxed constraint. Finally, a dynamic programming algorithm with complexity 0(T4) is developed to solve the global problem, where T is number of periods in planning horizon. The performance of the proposed algorithm is evaluated by numeric experiment.
| Original language | English |
|---|---|
| Pages (from-to) | 87-96 |
| Number of pages | 10 |
| Journal | Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice |
| Volume | 27 |
| Issue number | 9 |
| State | Published - Sep 2007 |
| Externally published | Yes |
Keywords
- Backlogging
- Dynamic programming
- Inventory capacity
- Lot sizing
- Outsourcing
Fingerprint
Dive into the research topics of 'Single item lot sizing models with backlogging and outsourcing and non-decreasing inventory capacity'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver