N2 - Security-constrained generation scheduling (SCGS) is an indispensable tool for independent system operators (ISOs) to plan a secure and economical hourly generation schedule in the daily/weekly ahead markets. Power outputs of thermal units are usually formulated as step functions in almost all literature on SCGS, i.e., the generation level schedule is taken as an energy delivery schedule. The ramp-rate constraints are also simplified as limits on the differences of generation levels in consecutive time periods. However, it has been found in our previous work that the energy delivery schedule obtained from this formulation may not be realizable. The schedule obtained is generally different from what is implemented. In this paper, feasible energy delivery is embedded in SCGS model and power outputs of thermal units are formulated as piece-wise linear functions rather than step functions. The schedule obtained from the new formulation is deliverable in terms of energy and precise ramping process for implementing the energy schedule is also obtainable. A mixed-integer linear programming (MILP) method is applied to solve the problem with the new formulation and numerical testing is performed for a six-bus system and an IEEE 118-bus system. The testing results and primary analysis show that the new formulation is valid.
AB - Security-constrained generation scheduling (SCGS) is an indispensable tool for independent system operators (ISOs) to plan a secure and economical hourly generation schedule in the daily/weekly ahead markets. Power outputs of thermal units are usually formulated as step functions in almost all literature on SCGS, i.e., the generation level schedule is taken as an energy delivery schedule. The ramp-rate constraints are also simplified as limits on the differences of generation levels in consecutive time periods. However, it has been found in our previous work that the energy delivery schedule obtained from this formulation may not be realizable. The schedule obtained is generally different from what is implemented. In this paper, feasible energy delivery is embedded in SCGS model and power outputs of thermal units are formulated as piece-wise linear functions rather than step functions. The schedule obtained from the new formulation is deliverable in terms of energy and precise ramping process for implementing the energy schedule is also obtainable. A mixed-integer linear programming (MILP) method is applied to solve the problem with the new formulation and numerical testing is performed for a six-bus system and an IEEE 118-bus system. The testing results and primary analysis show that the new formulation is valid.
KW - Deliverable energy schedule
KW - Mixed-integer linear programming
KW - Ramp-rate constraints
KW - Security-constrained generation scheduling
UR - https://www.scopus.com/pages/publications/71849118017
U2 - 10.1109/PES.2009.5275644
DO - 10.1109/PES.2009.5275644
M3 - 会议稿件
AN - SCOPUS:71849118017
SN - 9781424442416
T3 - 2009 IEEE Power and Energy Society General Meeting, PES '09
BT - 2009 IEEE Power and Energy Society General Meeting, PES '09
T2 - 2009 IEEE Power and Energy Society General Meeting, PES '09
Y2 - 26 July 2009 through 30 July 2009
ER -