Research on bidding strategy for an independent power plant

Research output: Contribution to journalArticlepeer-review

42 Scopus citations

Abstract

The emerging electricity market of imperfect competition makes it possible for each power supplier to gain more profits through strategic bidding. Through analyzing the relation between the clearing results and the coefficients of generator's bidding strategy, an optimization bidding strategy for single generator's is presented and an optimal adjusting method is obtained when generator's output exceeds its power generation limits. An iterative method is applied to clear market and the coefficients of plant's bidding strategy are got. For generators belonging to the same plant, the paper puts forward an optimized and combined bidding strategy model. Some examples are used to illustrate the feasibility of the proposed method and the results indicate that the bidding strategy of this paper can make independent power plant gain maximum profits in market competition environment.

Original languageEnglish
Pages (from-to)41-46
Number of pages6
JournalZhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering
Volume24
Issue number7
StatePublished - Jul 2004

Keywords

  • Bidding strategy
  • Combination bidding
  • Electric power engineering
  • Electricity market
  • Power generation limits

Fingerprint

Dive into the research topics of 'Research on bidding strategy for an independent power plant'. Together they form a unique fingerprint.

Cite this