Skip to main navigation Skip to search Skip to main content

Realization of T e0 > 10 keV long pulse operation over 100 s on EAST

  • The EAST Team
  • CAS - Institute of Plasma Physics
  • General Atomics
  • Commissariat à l’énergie atomique et aux énergies alternatives

Research output: Contribution to journalArticlepeer-review

13 Scopus citations

Abstract

In 2021, EAST realized a steady-state long pulse with a duration over 100 s and a core electron temperature over 10 keV. This is an integrated operation that resolves several key issues, including active control of wall conditioning, long-lasting fully noninductive current and divertor heat/particle flux. The fully noninductive current is driven by pure radio frequency (RF) waves with a lower hybrid current drive power of 2.5 MW and electron cyclotron resonance heating of 1.4 MW. This is an excellent experimental platform on the timescale of hundreds of seconds for studying multiscale instabilities, electron-dominant transport and particle recycling (plasma-wall interactions) under weak collisionality.

Original languageEnglish
Article number022001
JournalPlasma Science and Technology
Volume25
Issue number2
DOIs
StatePublished - 1 Feb 2022

Keywords

  • EAST tokamak
  • high T
  • integrated operation scenario

Fingerprint

Dive into the research topics of 'Realization of T e0 > 10 keV long pulse operation over 100 s on EAST'. Together they form a unique fingerprint.

Cite this