TY - GEN
T1 - Proactive Resilient Day-ahead Unit Commitment with Cloud Computing Data Centers
AU - Liu, Shengwei
AU - Zhao, Tianyang
AU - Liu, Xuan
AU - Li, Yuanzheng
AU - Wang, Peng
N1 - Publisher Copyright:
© 2021 IEEE.
PY - 2021
Y1 - 2021
N2 - To enhance the resilience of power systems towards the temporal and spatial impacts caused by extreme weather events, e.g. hurricanes, the flexibility of cloud computing data centers (CCDCs) is treated as a kind of efficient demand response. Since the workloads of CCDCs have the shifting capacity between different locations and time slots, a day-ahead unit commitment including data centers is proposed to explore the integrated spatial and temporal flexibility of the workloads to its full extent through task migration. Considering the uncertainty of probability density functions, the line failure rates, workload arrival rates, power loads are integrated into an ambiguity set. The scheduling process of generators and CCDCs is modeled as a two-stage distributionally robust optimization problem, which is reformulated as a large scale deterministic mixed integer linear programming problem and solved by the multi-cuts Benders decomposition method. The performance of proposed scheduling strategy is tested in modified IEEE-RTS system. The results reveal that the method could mitigate the adverse impacts of hurricanes by both enhancing the resilience of the power systems and decreasing the dropping workloads of CCDCs.
AB - To enhance the resilience of power systems towards the temporal and spatial impacts caused by extreme weather events, e.g. hurricanes, the flexibility of cloud computing data centers (CCDCs) is treated as a kind of efficient demand response. Since the workloads of CCDCs have the shifting capacity between different locations and time slots, a day-ahead unit commitment including data centers is proposed to explore the integrated spatial and temporal flexibility of the workloads to its full extent through task migration. Considering the uncertainty of probability density functions, the line failure rates, workload arrival rates, power loads are integrated into an ambiguity set. The scheduling process of generators and CCDCs is modeled as a two-stage distributionally robust optimization problem, which is reformulated as a large scale deterministic mixed integer linear programming problem and solved by the multi-cuts Benders decomposition method. The performance of proposed scheduling strategy is tested in modified IEEE-RTS system. The results reveal that the method could mitigate the adverse impacts of hurricanes by both enhancing the resilience of the power systems and decreasing the dropping workloads of CCDCs.
KW - Cloud computing data centers
KW - Resilience
KW - Transmission line failures
KW - Workload migration
UR - https://www.scopus.com/pages/publications/85124704658
U2 - 10.1109/IAS48185.2021.9677279
DO - 10.1109/IAS48185.2021.9677279
M3 - 会议稿件
AN - SCOPUS:85124704658
T3 - Conference Record - IAS Annual Meeting (IEEE Industry Applications Society)
BT - 2021 IEEE Industry Applications Society Annual Meeting, IAS 2021
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2021 IEEE Industry Applications Society Annual Meeting, IAS 2021
Y2 - 10 October 2021 through 14 October 2021
ER -