TY - JOUR
T1 - Proactive and reactive resource-constrained max-NPV project scheduling with random activity duration
AU - Zheng, Weibo
AU - He, Zhengwen
AU - Wang, Nengmin
AU - Jia, Tao
N1 - Publisher Copyright:
© 2017 Operational Research Society.
PY - 2018/1/2
Y1 - 2018/1/2
N2 - This paper addresses the resource-constrained project problem in which activity durations are stochastic variables and the objective is to maximize the net present value of cash flow in the project. First, using the two classical time buffering methods, proactive scheduling optimization models are constructed to generate the robust schedules. Then, two reactive scheduling models with different objectives are proposed to adjust the baseline schedules when disruptions occur during their execution. For the NP-hardness of the studied problem, three heuristic algorithms, including tabu search (TS), variable neighbourhood search (VNS), and a mixed version of VNS and TS, are developed and compared with the multi-start iteration improvement algorithm through a computational experiment conducted on a randomly generated data set. In addition, based on the computational results obtained, the effects of several key parameters on the proactive and reactive scheduling results are analysed, and some managerial insights are obtained. The research in this paper has practical implications for contractors to improve the project profit in an uncertain environment.
AB - This paper addresses the resource-constrained project problem in which activity durations are stochastic variables and the objective is to maximize the net present value of cash flow in the project. First, using the two classical time buffering methods, proactive scheduling optimization models are constructed to generate the robust schedules. Then, two reactive scheduling models with different objectives are proposed to adjust the baseline schedules when disruptions occur during their execution. For the NP-hardness of the studied problem, three heuristic algorithms, including tabu search (TS), variable neighbourhood search (VNS), and a mixed version of VNS and TS, are developed and compared with the multi-start iteration improvement algorithm through a computational experiment conducted on a randomly generated data set. In addition, based on the computational results obtained, the effects of several key parameters on the proactive and reactive scheduling results are analysed, and some managerial insights are obtained. The research in this paper has practical implications for contractors to improve the project profit in an uncertain environment.
KW - NPV maximization
KW - Project management
KW - proactive and reactive scheduling
KW - tabu search
KW - variable neighbourhood search
UR - https://www.scopus.com/pages/publications/85015250598
U2 - 10.1057/s41274-017-0198-3
DO - 10.1057/s41274-017-0198-3
M3 - 文章
AN - SCOPUS:85015250598
SN - 0160-5682
VL - 69
SP - 115
EP - 126
JO - Journal of the Operational Research Society
JF - Journal of the Operational Research Society
IS - 1
ER -