Abstract
Self-scheduling of autonomous power plant in energy intensive enterprise is of great importance in reducing both the cost of electricity consumption and the effects on the regional grid caused by serious fluctuation of load demand. Main deficiencies of the generally adopted discrete time based formulation framework in literature include the followings. The integral relationship between electrical energy and power output of generators is not exactly modeled. Uncertainty of load demand is also not fully addressed. Therefore, the scheduling results obtained by using the formulation may deviate from the optimal one under time-of-use price. A continuous time based scheduling formulation was established with consideration of both the above mentioned integral relationship and load demand uncertainty. By solving the final convex program formulation, an optimal scheduling solution in the sense of expectation can be obtained and no complete information of load demand distribution is required. Numerical testing was performed and the effectiveness of the method was verified.
| Original language | English |
|---|---|
| Pages (from-to) | 2648-2655 |
| Number of pages | 8 |
| Journal | Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering |
| Volume | 36 |
| Issue number | 10 |
| DOIs | |
| State | Published - 20 May 2016 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Autonomous power plant
- Convex programming
- Economic dispatch
- Electricity balance
- Newsvendor problem
- Time-of-use price
Fingerprint
Dive into the research topics of 'Power generation scheduling of autonomous power plant in energy intensive enterprise based on exact electricity balance constraints'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver