Optimal short term scheduling of cascaded hydroelectric chain plants with pumped-storage units

  • Xi'an Jiaotong University
  • Northwest China Grid Company Limited

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

2 Scopus citations

Abstract

In this paper, the short-term scheduling of cascaded hydroelectric chain plants with pumped-storage units is considered. Some integer variables are carefully introduced such that the original problem is successfully formulated as a mixed-integer linear programming. The model given in this paper admits of many complex characteristics such as nonlinear hydroelectric production function, minimum/maximum down/up time of hydro units, existence of pumped-units and time delay between plants, etc. CPLEX package is adopted to solve the problem. Numerical testing is also performed for a system with 3 cascaded reservoir, 12 hydro units and a pumped-storage plant with 5 pumped-units. The results suggest that the mixed-integer programming model given in this paper is very effective.

Original languageEnglish
Title of host publicationProceedings of the 27th Chinese Control Conference, CCC
Pages521-525
Number of pages5
DOIs
StatePublished - 2008
Event27th Chinese Control Conference, CCC - Kunming, Yunnan, China
Duration: 16 Jul 200818 Jul 2008

Publication series

NameProceedings of the 27th Chinese Control Conference, CCC

Conference

Conference27th Chinese Control Conference, CCC
Country/TerritoryChina
CityKunming, Yunnan
Period16/07/0818/07/08

Keywords

  • Hydroelectric production function
  • Mixed-integer linear programming
  • Pumped-storage units
  • Short-term hydro scheduling