Abstract
The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.
| Original language | English |
|---|---|
| Article number | 7151852 |
| Pages (from-to) | 2493-2494 |
| Number of pages | 2 |
| Journal | IEEE Transactions on Power Systems |
| Volume | 31 |
| Issue number | 3 |
| DOIs | |
| State | Published - May 2016 |
| Externally published | Yes |
Keywords
- Power system restoration
- resource allocation