Optimal black start resource allocation

  • Feng Qiu
  • , Jianhui Wang
  • , Chen Chen
  • , Jianzhong Tong

Research output: Contribution to journalArticlepeer-review

74 Scopus citations

Abstract

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.

Original languageEnglish
Article number7151852
Pages (from-to)2493-2494
Number of pages2
JournalIEEE Transactions on Power Systems
Volume31
Issue number3
DOIs
StatePublished - May 2016
Externally publishedYes

Keywords

  • Power system restoration
  • resource allocation

Fingerprint

Dive into the research topics of 'Optimal black start resource allocation'. Together they form a unique fingerprint.

Cite this