Online risk-reward model for time-cost tradeoff in project management

Research output: Contribution to journalArticlepeer-review

3 Scopus citations

Abstract

Taking into account the uncertain delay of work on the critical path, the online strategy and competitive analysis are introduced into time-cost optimizing in project management. The competitive ratio of the strategy is given, and the pre-rushing strategy is proved to be the best determinate one. The relationship between the general strategy and the optimal offline strategy is analyzed, and three properties are discovered. On this basis, this paper designs the risk tolerance strategy and proves its competitive ratio to help the project manager choosing the optimal strategy according to his own risk tolerance and forecast.

Original languageEnglish
Pages (from-to)141-146
Number of pages6
JournalXitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice
Volume29
Issue number12
DOIs
StatePublished - Dec 2009

Keywords

  • Competitive analysis
  • Online algorithm
  • Pre-rushing strategy
  • Risk-reward
  • Time-cost tradeoff