Online parallel machine scheduling to maximize the number of early jobs

  • Donghua University
  • Xi'an Jiaotong University
  • Tongji University
  • Laboratoire Génie Industriel

Research output: Contribution to journalArticlepeer-review

Abstract

We study a maximization problem: online scheduling on m identical machines to maximize the number of early jobs. The problem is online in the sense that all jobs arrive over time. Each job's characteristics, such as processing time and due date, become known at its arrival time. We consider the preemption-restart model, in which preemption is allowed, while once a job is restarted, it loses all the progress that has been made on this job so far. If in some schedule a job is completed before or at its due date, then it is called early (or on time). The objective is to maximize the number of early jobs. For m identical machines, we prove an upper bound 1 - (1 / 2 m) of competitive ratio and show that ECT (earliest completion time) algorithm is 1 / 2 -competitive.

Original languageEnglish
Article number939717
JournalMathematical Problems in Engineering
Volume2012
DOIs
StatePublished - 2012

Fingerprint

Dive into the research topics of 'Online parallel machine scheduling to maximize the number of early jobs'. Together they form a unique fingerprint.