Abstract
This paper studies the on-line production order scheduling problem where each preemption causes a penalty, and the objective is to maximize the net profit, i.e., the total weights of completed orders minus the total penalties caused by preemptions. Two greedy strategies are shown to be at best O(Δ2) and (4Δ + 2Δ√4 + 1/Δ + 1)-competitive respectively, where Δ is the ratio between the longest and shortest length of order. After that we mainly present an improved strategy, named WAL, which takes advantage of the knowledge of Δ and is proved to be (3Δ + o(Δ))-competitive for Δ > 9. Furthermore, two lower bounds for deterministic strategies, (1.366Δ + 0.366) and 6.33, are given for the cases of nonuniform and uniform length respectively.
| Original language | English |
|---|---|
| Pages (from-to) | 189-204 |
| Number of pages | 16 |
| Journal | Journal of Combinatorial Optimization |
| Volume | 13 |
| Issue number | 2 |
| DOIs | |
| State | Published - Feb 2007 |
Keywords
- Competitive ratio
- Competitive strategy
- On-line scheduling
- Preemption penalty
Fingerprint
Dive into the research topics of 'On-line production order scheduling with preemption penalties'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver