Abstract
Single-machine scheduling with an availability constraint to minimize total weighted completion time under the assumption that the disrupted job is semiresumable is considered in this paper. It is easily shown that this problem is NP-hard, and a dynamic programming algorithm and a branch-and-bound algorithm are developed to solve it optimally. Experiment results show that these two algorithms are accurate and efficient, and that the branch-and-bound outperforms the dynamic programming absolutely.
| Original language | English |
|---|---|
| Pages (from-to) | 134-143 |
| Number of pages | 10 |
| Journal | Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice |
| Volume | 29 |
| Issue number | 2 |
| State | Published - 2009 |
| Externally published | Yes |
Keywords
- Branch-and-bound
- Dynamic programming
- Semiresumable case
- Single-machine scheduling
- Weighted shortest processing time (WSPT)
Fingerprint
Dive into the research topics of 'Minimizing total weighted completion time in semiresumable case of single-machine scheduling with an availability constraint'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver