Abstract
In this article, the job shop scheduling problem with two batch-processing machines is considered. The machines have limited capacity and the jobs have non-identical job sizes. The jobs are processed in batches and the total size of each batch cannot exceed the machine capacity. The processing times of a job on the two machines are proportional. We show the problem of minimising makespan is NP-hard in the strong sense. Then we provide an approximation algorithm with worst-case ratio no more than 4, and the running time of the algorithm is O(nlogn). Finally, the performance of the proposed algorithm is tested by different levels of instances. Computational results demonstrate the effectiveness of the algorithm for all the instances.
| Original language | English |
|---|---|
| Pages (from-to) | 2185-2192 |
| Number of pages | 8 |
| Journal | International Journal of Systems Science |
| Volume | 43 |
| Issue number | 12 |
| DOIs | |
| State | Published - 1 Dec 2012 |
| Externally published | Yes |
Keywords
- approximation algorithm
- batch processing machines
- job shop
- non-identical job sizes