Skip to main navigation Skip to search Skip to main content

Mid-term load forecasting based on modified grey model

  • Hefei University of Technology

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

The construction of smart grid put forward higher requirements on deployment accuracy of the energy. Power generation and electricity sectors have carried out more accurate data analysis and forecasting. In this context, we provide a Gauss-Chebyshev GM(1,1) model, This model could overcome the lack of traditional grey model and made accurate forecasting of electricity consumption in smart grid, Finally, numerical examples demonstrate that this method can efficiently improve the prediction accuracy.

Original languageEnglish
Title of host publicationProceedings of the 2013 International Conference on Mechatronics and Automatic Control Systems, ICMS 2013
PublisherSpringer Verlag
Pages169-175
Number of pages7
ISBN (Print)9783319012728
DOIs
StatePublished - 2014
Externally publishedYes
Event2013 International Conference on Mechatronics and Automatic Control Systems, ICMS 2013 - Hangzhou, China
Duration: 10 Aug 201311 Aug 2013

Publication series

NameLecture Notes in Electrical Engineering
Volume237 LNEE
ISSN (Print)1876-1100
ISSN (Electronic)1876-1119

Conference

Conference2013 International Conference on Mechatronics and Automatic Control Systems, ICMS 2013
Country/TerritoryChina
CityHangzhou
Period10/08/1311/08/13

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • GM (1,1) model
  • Load forecasting
  • Smart grid

Fingerprint

Dive into the research topics of 'Mid-term load forecasting based on modified grey model'. Together they form a unique fingerprint.

Cite this