Skip to main navigation Skip to search Skip to main content

Long-term scheduling for cascaded hydro energy systems with annual water consumption and release constraints

  • Yanjia Zhao
  • , Xi Chen
  • , Qing Shan Jia
  • , Xiaohong Guan
  • , Shuanghu Zhang
  • , Yunzhong Jiang
  • Tsinghua University
  • China Institute of Water Resources and Hydropower Research

Research output: Contribution to journalArticlepeer-review

27 Scopus citations

Abstract

Long-term scheduling for cascaded hydro energy systems is very important for low carbon energy production. It aims at determining the water release over a planning horizon to meet water resource requirements and the system demands for electric power. The problem is challenging in view of the complicated and stochastic system dynamics, nonlinear marginal cost, coupled hydraulic constraints, and the large problem size. In this paper we formulate the long-term scheduling problem of cascaded hydro energy systems with annual consumption and release constraints as a finite horizon constrained Markov decision process (CMDP), and develop a new rollout algorithm to optimize the policies. Numerical results demonstrate the effectiveness and the efficiency of the formulation and the new algorithm.

Original languageEnglish
Article number5475356
Pages (from-to)969-976
Number of pages8
JournalIEEE Transactions on Automation Science and Engineering
Volume7
Issue number4
DOIs
StatePublished - Oct 2010

Keywords

  • Cascaded hydro energy systems
  • constrained Markov decision process (CMDP)
  • long-term scheduling
  • rollout algorithm

Fingerprint

Dive into the research topics of 'Long-term scheduling for cascaded hydro energy systems with annual water consumption and release constraints'. Together they form a unique fingerprint.

Cite this