Logic-based Benders decomposition method for the seru scheduling problem with sequence-dependent setup time and DeJong's learning effect

  • Nanjing University of Science and Technology
  • Doshisha University

Research output: Contribution to journalArticlepeer-review

84 Scopus citations

Abstract

This paper concentrates on the scheduling problem in seru production system (SPS), where seru is a successful new-type production mode arising from the Japanese labor-intensive electronic assembly industry. Motivated by the practical situations, the sequence-dependent setup time and DeJong's learning effect are considered in seru scheduling problems, and the objective is to minimize the makespan. The seru scheduling problem is formulated as a mixed-integer programming (MIP), and then reformulated to a set partitioning master problem and some independent subproblems by employing the logic-based Benders decomposition (LBBD) method. Subsequently, the set partitioning master problem is used to assign jobs to serus of SPS, and the subproblems are applied to find the optimal schedules in each seru given the assignment of the master problem. Finally, computational studies are made, and results indicate that the LBBD method is able to return high-quality schedules for solving seru scheduling problems.

Original languageEnglish
Pages (from-to)866-877
Number of pages12
JournalEuropean Journal of Operational Research
Volume297
Issue number3
DOIs
StatePublished - 16 Mar 2022

Keywords

  • Decomposition
  • Learning effect
  • Scheduling
  • Sequence-dependent setup time
  • Seru production system