TY - GEN
T1 - Energy delivery capacity and generation scheduling in the deregulated electric power market
AU - Guan, Xiaohong
AU - Gao, Feng
AU - Svoboda, Alva
PY - 1999
Y1 - 1999
N2 - The generation schedules obtained in traditional hydrothermal scheduling or unit commitment programs are in hourly generation levels. In the new deregulated power market, the power transactions are processed in terms of hourly energy delivery. Failing to fulfill scheduled energy delivery may result in penalty to power producers. This paper shows that although ramp-rate constraints are satisfied in hydrothermal scheduling, taking a generation level schedule as an energy delivery schedule may not be realizable. Based on the Maximum Principle in optimal control theory, the energy delivery capacity across the scheduling horizon is established as a set of recursive equations with given ramp-rate constraints. A sufficient and necessary condition is obtained to check if an energy delivery schedule is realizable. Based on this condition, two cases, where ramp-rate constraints are both satisfied, are analyzed and an unrealizable energy delivery schedule is observed.
AB - The generation schedules obtained in traditional hydrothermal scheduling or unit commitment programs are in hourly generation levels. In the new deregulated power market, the power transactions are processed in terms of hourly energy delivery. Failing to fulfill scheduled energy delivery may result in penalty to power producers. This paper shows that although ramp-rate constraints are satisfied in hydrothermal scheduling, taking a generation level schedule as an energy delivery schedule may not be realizable. Based on the Maximum Principle in optimal control theory, the energy delivery capacity across the scheduling horizon is established as a set of recursive equations with given ramp-rate constraints. A sufficient and necessary condition is obtained to check if an energy delivery schedule is realizable. Based on this condition, two cases, where ramp-rate constraints are both satisfied, are analyzed and an unrealizable energy delivery schedule is observed.
UR - https://www.scopus.com/pages/publications/0032597595
M3 - 会议稿件
AN - SCOPUS:0032597595
SN - 0780354796
T3 - IEEE Power Industry Computer Applications Conference
SP - 25
EP - 30
BT - IEEE Power Industry Computer Applications Conference
PB - IEEE
T2 - Proceedings of the 1999 21st International Conference on Power Industry Computer Applications, PICA '99
Y2 - 16 May 1999 through 21 May 1999
ER -