Delay Analysis and Compensation for Digital MSOGI-QSG Implementation in Back-To-Back Interfacing Converter between Microgrid and Utility Grid for Harmonic Extraction

  • Yai Pioth Yai Deng
  • , Jinjun Liu
  • , Md Omar Faruque
  • , Sastry Pamidi
  • Xi'an Jiaotong University
  • Florida State University

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

Abstract

Due to its ability to detect different harmonic components in highly polluted grid conditions and harmonics induced into the microgrid point of common coupling (PCC) bus by nonlinear loads, the multiple second-order generalized integrator-quadrature signal generator (MSOGI-QSG) is widely used in domains like grid synchronization and signal extraction. However, it typically suffers from an ac discretization error problem in digital implementation. The impact of unit delay in cross feedback to break algebraic loops in digital implementation is investigated in this paper, and it is discovered that uncompensated delay causes steady-state errors even if individual second-order generalized integrator-quadrature signal generator (SOGI-QSG) discretization is accurate. Based on the findings, a simple and effective rotational transformation-based compensation method is proposed, which considerably enhances the accuracy of signal extraction and frequency estimation when used in conjunction with a frequency-locked loop (FLL). The proposed method is validated through experimental results.

Original languageEnglish
Title of host publication2022 IEEE Industrial Electronics and Applications Conference, IEACon 2022
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages163-168
Number of pages6
ISBN (Electronic)9781665480062
DOIs
StatePublished - 2022
Externally publishedYes
Event3rd IEEE Industrial Electronics and Applications Conference, IEACon 2022 - Virtual, Online, Malaysia
Duration: 3 Oct 2022 → 4 Oct 2022

Publication series

Name2022 IEEE Industrial Electronics and Applications Conference, IEACon 2022

Conference

Conference3rd IEEE Industrial Electronics and Applications Conference, IEACon 2022
Country/TerritoryMalaysia
CityVirtual, Online
Period3/10/22 → 4/10/22

Keywords

  • Multiple second-order generalized integrator-quadrature signal generator
  • back-To-back interfacing converter.
  • digital implementation
  • frequency-locked loop
  • harmonics signal extraction

Fingerprint

Dive into the research topics of 'Delay Analysis and Compensation for Digital MSOGI-QSG Implementation in Back-To-Back Interfacing Converter between Microgrid and Utility Grid for Harmonic Extraction'. Together they form a unique fingerprint.

Cite this