Crack Tunneling in Cement Sheath of Hydrocarbon Well

Research output: Contribution to journalArticlepeer-review

17 Scopus citations

Abstract

In a hydrocarbon well, cement fills the annular gap between two steel casings or between a steel casing and rock formation, forming a sheath that isolates fluids in different zones of the well. For a well as long as several kilometers, the cement sheath covers a large area and inevitably contains small cracks. The cement sheath fails when a small crack grows and tunnels through the length of the well. We calculate the energy release rate at a steady-state tunneling front as a function of the width of the tunnel. So long as the maximum energy release rate is below the fracture energy of the cement, tunnels of any width will not form. This failsafe condition requires no measurement of small cracks, but depends on material properties and loading conditions. We further show that the critical load for tunneling reduces significantly if the cement/casing and cement/formation interfaces slide.

Original languageEnglish
Article number011002
JournalJournal of Applied Mechanics, Transactions ASME
Volume83
Issue number1
DOIs
StatePublished - 1 Jan 2016

Keywords

  • crack tunneling
  • friction
  • wellbore cement

Fingerprint

Dive into the research topics of 'Crack Tunneling in Cement Sheath of Hydrocarbon Well'. Together they form a unique fingerprint.

Cite this