TY - GEN
T1 - Analysis of wind power integration capacity in wind-hydro-thermal hybrid power system
AU - Sun, Can
AU - Bie, Zhaohong
AU - Li, Gengfeng
AU - Hua, Bowen
PY - 2012
Y1 - 2012
N2 - An improved analysis approach for wind power integration capacity (WPIC) is proposed. In this paper, WPIC is composed of two parts, one provided by hydro power and the other provided by thermal power. After proper consideration of wind power randomness, WPIC provided by hydro power is determined by the regulation ability of reservoir in hydro power plants. Then, a concept of equivalent thermal power units output duration curve is proposed to accurately evaluate WPIC provided by thermal power in a probabilistic perspective. Numerical tests are conducted on Gansu power grid in 2015. Monthly WPIC under different scenarios are determined, which validates the effectiveness of this approach.
AB - An improved analysis approach for wind power integration capacity (WPIC) is proposed. In this paper, WPIC is composed of two parts, one provided by hydro power and the other provided by thermal power. After proper consideration of wind power randomness, WPIC provided by hydro power is determined by the regulation ability of reservoir in hydro power plants. Then, a concept of equivalent thermal power units output duration curve is proposed to accurately evaluate WPIC provided by thermal power in a probabilistic perspective. Numerical tests are conducted on Gansu power grid in 2015. Monthly WPIC under different scenarios are determined, which validates the effectiveness of this approach.
KW - thermal power peak-regulating
KW - wind power integration capacity
KW - wind-hydro coordination
UR - https://www.scopus.com/pages/publications/84874731187
U2 - 10.1109/ISGTEurope.2012.6465821
DO - 10.1109/ISGTEurope.2012.6465821
M3 - 会议稿件
AN - SCOPUS:84874731187
SN - 9781467325974
T3 - IEEE PES Innovative Smart Grid Technologies Conference Europe
BT - 2012 3rd IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2012
T2 - 2012 3rd IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2012
Y2 - 14 October 2012 through 17 October 2012
ER -