@inproceedings{802f33d5eddf4ec6bc1413e32a1efbe6,
title = "An integrated framework for the optimization of project risk response plan under resource constraints with genetic algorithm",
abstract = "In this paper we present an original framework for optimizing project risk response plan. The simulation technique is used to model the project risk network and to test the proposed mitigation actions. A genetic algorithm-based model is developed, aimed at choosing response actions and optimizing the allocation of budget reserves dedicated to the risk management. An example of application to a real transportation construction project is presented.",
keywords = "complexity, genetic algorithm, project management, resource constraints, risk management",
author = "Chao Fang and Franck Marle and Enrico Zio",
year = "2011",
doi = "10.1109/ICQR2MSE.2011.5976743",
language = "英语",
isbn = "9781457712326",
series = "ICQR2MSE 2011 - Proceedings of 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering",
pages = "856--861",
booktitle = "ICQR2MSE 2011 - Proceedings of 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering",
note = "2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering, ICQR2MSE 2011 ; Conference date: 17-06-2011 Through 19-06-2011",
}