title = "Accounting for risk interactions and using importance measures for risk prioritization in project management",
abstract = "In this paper we present a method using importance measures for project risk prioritization. First, a simulation-based risk network model is used to account for risk interactions. Various measures are then proposed to assess the risks and risk interactions with respect to their influence on the defined global risk exposure. An example of application to a real musical staging project is presented.",
keywords = "Complexity, decision support, importance measures, project management, risk prioritization",
author = "Chao Fang and Xun Xiao and Xiaoyan Zhu",
year = "2012",
doi = "10.1109/IEEM.2012.6838096",
language = "英语",
isbn = "9781467329453",
series = "IEEE International Conference on Industrial Engineering and Engineering Management",
publisher = "IEEE Computer Society",
pages = "1998--2002",
booktitle = "2012 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2012",
note = "2012 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2012 ; Conference date: 10-12-2012 Through 13-12-2012",
}