Abstract
Demand response plays a more and more significant role in scheduling strategies of power system, one essential component of which is high energy-consuming enterprises participating in ancillary service and offering reserve. On condition that high energy-consuming enterprises provide power grid with system reserve, a production scheduling mathematical model with finite buffers is built to achieve goal of minimizing electricity purchasing cost, and a robust production scheduling method for ensuing optimized production scheduling strategy is proposed, considering random beginning time of load curtailment during peak time. A case study is conducted to verify feasibility and effectiveness of the proposed model.
| Original language | English |
|---|---|
| Pages (from-to) | 2128-2133 |
| Number of pages | 6 |
| Journal | Dianwang Jishu/Power System Technology |
| Volume | 40 |
| Issue number | 7 |
| DOIs | |
| State | Published - 5 Jul 2016 |
Keywords
- Electricity purchasing cost
- High energy-consuming enterprises
- Load curtailment
- Power system reserve
- Robust production scheduling method
Fingerprint
Dive into the research topics of 'A robust production scheduling method of high energy-consuming enterprises considering providing power grid with reserve'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver