Abstract
A model of resource optimization and reallocation for software development based on the Putnam estimation model and modularization method was proposed. With the limitation of development resource, the optimization resource is calculated and allocated by nonlinear decision method for very module firstly. At the same time, the optimization productivity is also calculated. Every module's real productivity should be detected at any moment during the developing process. Comparing the real productivity with optimization productivity, the resource for these modules can be adjusted in order to get optimization productivity for the whole software development. A simulation experiment demonstrates the effectiveness by this model.
| Original language | English |
|---|---|
| Pages (from-to) | 1445-1448 |
| Number of pages | 4 |
| Journal | Xitong Fangzhen Xuebao / Journal of System Simulation |
| Volume | 19 |
| Issue number | 7 |
| State | Published - 5 Apr 2007 |
| Externally published | Yes |
Keywords
- Development resource
- Module
- Optimization
- Productivity
- Reallocation