Abstract
Large-scale integration of wind power makes the peak load regulation become more and more serious. As a result, the analysis of daily operation manner plays an important role in determining the power architecture. Based on traditional generation expansion planning method focusing on economic and reliability indices, this paper proposes a daily operation arrangement and peak load regulation algorithm, which is established on the basis of multi-state renewable energy simulation, and is used to test the running feasibility of the power generation planning result. The algorithm proposes a sequential multi-state wind generation model established on a Markov process with state transition matrices and initial distribution based on historical data. Also, the algorithm proposes an efficient multi-state energy function forming method based on equivalent energy function method to analyze the power and energy balance and peak load regulation of the system using a deterministic production simulation. So the algorithm can ensure the economy, reliability and feasibility of the power generation planning. Test system was used to verify the rationality and feasibility of the proposed models and algorithm and the results of this paper may provide some suggestions for the generation planning.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 5th IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies, DRPT 2015 |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| Pages | 2571-2575 |
| Number of pages | 5 |
| ISBN (Electronic) | 9781467371063 |
| DOIs | |
| State | Published - 11 Mar 2016 |
| Event | 5th IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies, DRPT 2015 - Changsha, China Duration: 26 Nov 2015 → 29 Nov 2015 |
Publication series
| Name | Proceedings of the 5th IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies, DRPT 2015 |
|---|
Conference
| Conference | 5th IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies, DRPT 2015 |
|---|---|
| Country/Territory | China |
| City | Changsha |
| Period | 26/11/15 → 29/11/15 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Markov process
- Peak load regulation
- Power and energy balance
- Power generation planning
- Production simulatio-n
- Wind power
Fingerprint
Dive into the research topics of 'A daily operation arrangement and peak load regulation algorithm based on multi-state renewable energy simulation'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver